Categories

A sample text widget

Etiam pulvinar consectetur dolor sed malesuada. Ut convallis euismod dolor nec pretium. Nunc ut tristique massa.

Nam sodales mi vitae dolor ullamcorper et vulputate enim accumsan. Morbi orci magna, tincidunt vitae molestie nec, molestie at mi. Nulla nulla lorem, suscipit in posuere in, interdum non magna.

USA: Cupertino buildings prepare for electric-vehicle charging stations

Electrical vehicles could rule the roads of the future, and city staff wants new buildings in Cupertino to be ready.

The city council voted March 4 to amend its municipal code with an ordinance that requires pre-wiring for electric-vehicle charging systems in new buildings. The city rationale is that doing the wiring ahead of time would lower the cost for the future installation of those systems.

New single-, two-and multi-family dwellings as well as new non-residential buildings will need to have conduits, wires or dedicated circuits installed from the main building electrical panel out to a parking area.
More mercurynews.com

Share

Leave a Reply