Categories

A sample text widget

Etiam pulvinar consectetur dolor sed malesuada. Ut convallis euismod dolor nec pretium. Nunc ut tristique massa.

Nam sodales mi vitae dolor ullamcorper et vulputate enim accumsan. Morbi orci magna, tincidunt vitae molestie nec, molestie at mi. Nulla nulla lorem, suscipit in posuere in, interdum non magna.

PGA National Resort & Spa Launches Electric Vehicle Charging Stations

PGA National Resort & Spa launched its new Electric Vehicle Supply Equipment (EVSE) charging stations with a reception on Oct. 7 (6 – 7:30 p.m.)

The South Florida destination is the first in the area to install the Eaton electric vehicle charging stations for electric and hybrid cars. Its parking lot will be outfitted with three total charging stations — two Eaton Commercial Level II Chargers and one Eaton DC Level III Quick Charger.

The DC Quick Charging unit is capable of fully charging a vehicle in 40 minutes or less, while the two Level II chargers can full charge an electric vehiclewithin a few hours. Designed to increase travel radius and reduce range anxiety, the DCQC charging infrastructure supplies a quick connection to the grid for drivers on the go with a fast direct charge of electricity needed to refill the battery.
Moore internatinalmeetingreview.com

Share

Leave a Reply