Categories

A sample text widget

Etiam pulvinar consectetur dolor sed malesuada. Ut convallis euismod dolor nec pretium. Nunc ut tristique massa.

Nam sodales mi vitae dolor ullamcorper et vulputate enim accumsan. Morbi orci magna, tincidunt vitae molestie nec, molestie at mi. Nulla nulla lorem, suscipit in posuere in, interdum non magna.

Building an Electric Vehicle Highway to Energy Security: Tennessee EV Project

Electric vehicles (EVs)—notwithstanding the high-end success story of Tesla Motors—remain stuck in a classic “chicken and egg” dilemma. Achieving widespread market penetration requires ubiquitous charging stations. But charging station scale-up requires a critical mass of EVs already on the road to justify the investment.

One approach to this problem is what a variety of partners in the state of Tennessee are doing through a $230 million public-private partnership partly funded by a grant from the Department of Energy (DOE) and managed by ECOtality. Together, these actors—working as a charter market for Ecotality’s EV Project, the largest deployment of EVs and charging infrastructure to date—are forcing the issue and simply blowing through the market challenge by building a ton of charging stations fast.

Tennessee’s involvement in the project is remarkable for a number of reasons. For one thing, the Tennessee effort is seeking to get to scale fast and so covers a larger geographical area than any other EV Project site. Knoxville, Chattanooga, Nashville, Memphis, and other smaller towns in east, west, and middle Tennessee are all gaining charging sites. In fact, DOE data reveal that there are 294 public EV charging stations in Tennessee catering to cars such as the Nissan Leaf, Chevrolet Volt, and Ford Focus Electric. Tennessee businesses including Cracker Barrel, Sears, and Crowne Plaza now host EV Project charging stations. Even more impressive are moves to essentially cover the full expanse of the state at highway scale. Most notable is the new coverage of the 425-mile stretch of highway that connects Knoxville, Nashville, and Chattanooga in what is known as the Tennessee Triangle. That is actually the nation’s largest EV charging corridor connecting multiple metropolitan areas.

Additionally, Tennessee’s EV project is also noteworthy for the strong support it has received from a variety of partners including state and local government, regional utility partners, the Tennessee Valley Authority (TVA), Oak Ridge National Laboratory (ORNL), and Nissan North America. Tennessee committed $2.5 million early on in the project to give as rebates to people purchasing the Leaf and Volt models. TVA, in partnership with ORNL and the Electric Power Research Institute, has developed solar assisted EV charging stations—also called the Smart Modal Area Recharge Terminal (SMART)—to minimize demand on the grid and integrate the use of renewable energy sources. The SMART station is being deployed in conjunction with the EV Project and 125 charging stations have been installed in the Knoxville-Nashville-Chattanooga corridor.
More brookings.edu

Share

Leave a Reply