Categories

A sample text widget

Etiam pulvinar consectetur dolor sed malesuada. Ut convallis euismod dolor nec pretium. Nunc ut tristique massa.

Nam sodales mi vitae dolor ullamcorper et vulputate enim accumsan. Morbi orci magna, tincidunt vitae molestie nec, molestie at mi. Nulla nulla lorem, suscipit in posuere in, interdum non magna.

USA: Leviton to install home charging station for 2012 Toyota Prius Plug-in in October

Leviton, a manufacturer of electrical wiring devices, will install 16-amp, Level 2 (240V) home charging station for the 2012 Toyota Prius Plug-in hybrid vehicle in early October 2011, in the US.

The company said that the installation packages will start at $999, and its customers can purchase the charging station and arrange for home installation through a Leviton-certified electrical contractor by visiting leviton.com/Toyota or calling 1-855-5-PLUGIN.

The new home charging station is expected to decrease the required charging time for the Toyota 2012 Prius Plug-in to approximately 1.5 hours compared to approximately 3 hours using the factory-provided 120V cord set.

The company said that the charging station which can be cord connected or hardwired, has a small footprint and requires a minimum amount of wall space for installation.

Leviton’s Commercial and Industrial Business Unit VP and GM Michael Mattei said with the Prius Plug-in coming to market in early 2012, there is a lot of excitement around the adoption of electrified vehicles.

More automotive-business.-review.com

Share

Leave a Reply